WHY STEELPAC

Why choose Steelpac?

  • Customizable designs of Steel Buildings via the aid of highly advanced and licensed software.
  • Light-weight flexible frames offering high resistance to earthquakes.
  • Unique manufacturing philosophy ensuring the use of sophisticated fully automated
  • machinery to rightfully place each component in the right position.
  • Standard component linkages to simplify structural erection.
  • Logistics ensures speedy delivery within 8 to 10 weeks after Anchor bolt setting.
  • ISO 9001:2008 certified.
  • Complies with local building codes of Bangladesh.
  • Economical, time-conserving as well as minimum site disruption.

Below are a few more unique aspects about Steelpac:

Quality Steel

  • Column, Rafter, Beam, Sub beam: Primary Build-Up Members, Minimum yield strength is 34.5kN/cm². High grade steel plate conforming to ASTM A 572M Grade 345 (Grade 50ksi). Factory painted with a minimum of 35 microns (DFT) of corrosion protection primer.
  • Purlins, girts and eave strut : Purlins, girts and eave struts are available in high grade steel conforming to ASTM A 607 Grade 50 equivalent, available in 1.5mm, 1.8mm, 2.0mm and 2.5mm thickness. It is pre-galvanized finish or factory painted with a minimum of 35 microns (DFT) of corrosion protection primer.
  • Roof and Wall Panels: 0.50mm thickness in ZINCALUME® steel resin coated, AZ150 minimum (150g/m²) coating mass, Grade 550 (minimum yield strength of 550 MPa) or complying with AS1397.
  • Nuts & Bolts: These bolts are Hot-dip-Galvanized & conform to ASTM A 325 M Type 1 (or equivalent) (Grade 8.8).
  • Fasteners: Metallic Polyester Coated, heat-treated carbon steel, conforming to AS 3566 Class 3. They are 5.5mm diameter, Hex-heat, self-drilling screws and assembled with EPDM seals.

Welding Standard

All welding performed in accordance with the American Welding Association (AWS 2004 edition). Minimum weld sizes conforms to table 5.8 AWS D1.1-2-2004

Quality Control (QC) Standard

QC criteria used in fabrication is based on Steelpac Manufacturing Standard & conforming to 9th edition of AISC and 1996 edition of MBMA.

Safely First

Steel erection activities are performed adhering to safety standards set according to Occupational Safety and Health Administration (OSHA) when they occur during and as a part of the steel erection activities.

Production Facilities

State-of-the-Art manufacturing facility with capacity of 18,000MT per year. Steelpac factory worked with high-precision, sophisticated CNC-enabled with American manufacturing equipment. All manufacturing facilities are ISO 9001 Certified.

Quality of the Welding Materials

Materials conforms to AWS A 5.1 for manual welding, conforms to AWS A5.20-95E71T-1 for semi-automatic and AWS A5.17 or ASME SFA-5.17 for automatic welding.

Own Erection Team

Steelpac apply the fast tracking or crashing method to ensuring the project time schedule (PTS) is a common practice. The erection activities are operated under Expert supervision team and we provide 24/7 service at client’s requirement.